FiveTC FOOD PROCESSING FACTORY PROJECT
 
To realize the business strategy in 2017-2022, FiveTC Joint Stock Company is investing the Food Processing factory in Cat Lai Industrial Zone, District 2, Ho Chi Minh City.
 
PROJECT INFORMATION:
1. Project name:
  • Project name: Construction of (FiveTC Foods)
  • Location: Cat Lai Industrial Zone, District 2, Ho Chi Minh City
  • Investor: FiveTC Joint Stock Company
  • Address of headquarters: 14 BT3, Van Quan-Yen Phuc urban area, Phuc La ward, Ha Dong, Hanoi
  • Form of investment: New construction investment
2. Investment location
The frozen food processing factory is located in Cat Lai Industrial Zone, District 2, Ho Chi Minh City FiveTC Food Processing factory
3. Investment scope:
3.1 Planning indicators:
  • Factory construction area: 4,655 (m2)
  • Land usage ratio:
  • Factory         height:
  • Construction density:
3.2 Construction work:
The expected construction work includes the following items:
  • Processing area: 3,712m2, 2 floors, 8m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, colored galvanized tole roof.
  • Auxiliary area: 370m2, 3 floors, 10m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, colored galvanized tole roof.
  • Security house, main gate: 27m2, 1 floor, 3,5m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, colored galvanized tole roof.
  • Power station: 82m2, 1 floor, 4m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, RC roof.
  • 2-wheel vehicle garage: 163m2, 3 floors, 3,3m high. Structure is of steel truss frame, colored galvanized tole roof.
  • 2-wheel and 4-wheel vehicle garage: 98 m2, 1 floor, 3,3m high. Structure is of steel truss frame, colored galvanized tole roof.
  • Gas tank: 16m2, 1 floor, 3,8m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, RC roof.
  • Boiler house: 25m2, 1 floor, 3,8m high. Structure is of RC frame, surrounding wall uses 200m thick bricks, water paint for wall finish, RC roof.
  • Sewage, water processing tank: 162m2, structure is of RC frame.
  • Systems for power, firefighting, water supply, rainwater drainage, domestic sewage drainage are designed fully for the work. 

Importing and distribution of food

Dated 22/05/2017
FiveTC Joint Stock Company have strong and strict criteria in selecting partners and food providers from foreign countries. Our top prioritized criteria are reputation, quality and service.

 Reputation: 
Always guarantee our source of goods supplied to the market
Always maintain and constantly improve product quality
Ensure timely delivery 

 Quality:
Always search for safe quality food providers certified by the authority of the exporting country.
Ensure to meet food safety standards in all processes from importing, storage, preliminary treatment, packaging, and delivery to the consumers.

 Service:
Always serve customers with smiles
Properly perform receipt to delivery processes for best responses to customers’ requirements
Sales and shipping professional staff are always enthusiastic listening to customers and always committed to receive returns and provide exchanges for faulty and unsatisfactory products in a timely manner

Toward a 5-star criterion, we always provide customer centric services with the best quality. We welcome all comments and feedback for better and better services